MORRISON RD over MAD CREEK

0.65 MI S OF GATES BR RD · County 043, Oregon · Built 2001 · 2 Lanes · 309 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
19677 000 00000
Year Built
2001
Length
15.2 m (49.9 ft)
Max Span
14.9 m
Width
4.9 m (16.1 ft)
Lanes
2
Daily Traffic
309
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$160,000
Total Project Cost
$256,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.