US 199 (HWY 025) over E FK ILLINOIS RIVER

29.4 MI W GRANTS PASS · County 033, Oregon · Built 2006 · 2 Lanes · 5,771 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
19267 025 02940
Year Built
2006
Length
133 m (436.4 ft)
Max Span
54 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
5,771
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.