MINTER BRIDGE ROAD over TUALATIN RIVER OVERFLOW

001 MI N TUALATIN RIVER · County 067, Oregon · Built 2002 · 2 Lanes · 7,649 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
19193 093500190
Year Built
2002
Length
58.4 m (191.6 ft)
Max Span
29 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
7,649
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.