US 395 (HWY 028) over M FK JOHN DAY R (RITTER)
13.4MI S UMATILLA CO LINE · County 023, Oregon · Built 2004 · 2 Lanes · 308 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
44.835811, -119.032069
This bridge is in worse condition than 51.7% of bridges in County 023. The average bridge in Oregon is 0 years old; this one is 22 years old.
Bridge Details
- Structure #
- 18804 028 07738
- Year Built
- 2004
- Length
- 145.6 m (477.7 ft)
- Max Span
- 40 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 308
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.