US 395 (HWY 028) over M FK JOHN DAY R (RITTER)

13.4MI S UMATILLA CO LINE · County 023, Oregon · Built 2004 · 2 Lanes · 308 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 6 Satisfactory

Location

44.835811, -119.032069

This bridge is in worse condition than 51.7% of bridges in County 023. The average bridge in Oregon is 0 years old; this one is 22 years old.

Nearby Bridges

Bridge Details

Structure #
18804 028 07738
Year Built
2004
Length
145.6 m (477.7 ft)
Max Span
40 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
308
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.