POVERTY BEND RD over N YAMHILL RIVER

2.5 MI NO.OF MCMINNVILLE · County 071, Oregon · Built 1998 · 2 Lanes · 314 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
18448 000 00000
Year Built
1998
Length
40.8 m (133.9 ft)
Max Span
40.2 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
314
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$429,000
Total Project Cost
$687,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.