HWY 260 over LIMPY CREEK

17.5 MI W HWY 025 SB JCT · County 033, Oregon · Built 1998 · 2 Lanes · 1,316 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
18214 260 01750
Year Built
1998
Length
45.7 m (149.9 ft)
Max Span
45.7 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
1,316
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.