KUKKULA ROAD over BEAVER CREEK

020 M E CITY OF CLATSKANI · County 009, Oregon · Built 1998 · 2 Lanes · 168 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
18044 408700001
Year Built
1998
Length
35.8 m (117.5 ft)
Max Span
17.4 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
168
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$376,000
Total Project Cost
$602,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.