THREE RIVERS ROAD over THREE RIVERS OFLOW

030 MI SE OF HEBO · County 057, Oregon · Built 1995 · 1 Lanes · 158 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
17925 309200025
Year Built
1995
Length
14 m (45.9 ft)
Max Span
13.7 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
158
Material
Prestressed Concrete
Design
Slab
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$147,000
Total Project Cost
$236,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.