US 30 (HWY 449) over BURNT RIVER (DURBIN)

4.6 MI. SE JCT. I-84 · County 001, Oregon · Built 1995 · 2 Lanes · 551 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
17444 449 00456
Year Built
1995
Length
33.8 m (110.9 ft)
Max Span
33.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
551
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.