HWY 372 over SNOW TRAIL
MP 18 CENTURY DRIVE · County 017, Oregon · Built 1991 · 2 Lanes · 2,129 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.9839, -121.6035
This bridge is in worse condition than 52.6% of bridges in County 017. The average bridge in Oregon is 0 years old; this one is 35 years old.
Bridge Details
- Structure #
- 17202 372 01828
- Year Built
- 1991
- Length
- 21.3 m (69.9 ft)
- Max Span
- 21.3 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 2,129
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.