OR 34 (Hwy 33) Con over SW 3rd Street

SOUTH CORVALLIS · County 003, Oregon · Built 1991 · 1 Lanes · 2,176 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
17053 033R05596
Year Built
1991
Length
243.8 m (799.9 ft)
Max Span
40.5 m
Width
8.7 m (28.5 ft)
Lanes
1
Daily Traffic
2,176
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,562,000
Total Project Cost
$4,099,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.