Hwy 026 (OR 35) over E Fk Hood River
5.3 MI S HWY 281 JCT · County 027, Oregon · Built 1961 · 2 Lanes · 1,578 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
45.4648, -121.569325
This bridge is in worse condition than 81.7% of bridges in County 027. The average bridge in Oregon is 0 years old; this one is 65 years old.
Nearby Bridges
Hwy 026 (OR 35) over Dog River
Built 1961
COUNTY RD 418 over EAST FORK HOOD RIVER
Built 1964
COUNTY RD 424 over EVANS CREEK
Built 2019
OR 35 (HWY 026) over POLALLIE CREEK OFLOW
Built 2010
COUNTY RD 427 over E FORK HOOD RIVER
Built 1969
Hwy 026 (OR 35) over E Fork Hood R
Built 1962
ROAD over COE CREEK
Built 1995
NO DATA ENTERED over PINNACLE CREEK
Built 2001
HWY 281 over E FK OF HOOD RIVER
Built 1989
Hwy 026 (OR 35) over Irrigation Ditch
Built 1961
Bridge Details
- Structure #
- 16006 026 07968
- Year Built
- 1961
- Length
- 42.7 m (140.1 ft)
- Max Span
- 27.4 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,578
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.