LONDON RD over COAST FORK WILLAMETTE R

029MI S COTTAGE GROVE DAM · County 039, Oregon · Built 1960 · 2 Lanes · 5,141 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
14867A270000672
Year Built
1960
Length
52.1 m (170.9 ft)
Max Span
17.7 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
5,141
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$548,000
Total Project Cost
$876,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.