PEORIA RD over SLOUGH
030 MI S. HWY. 34 · County 043, Oregon · Built 1961 · 2 Lanes · 3,450 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
44.529331, -123.202781
This bridge is in worse condition than 20.6% of bridges in County 043. The average bridge in Oregon is 0 years old; this one is 65 years old.
Nearby Bridges
PEORIA RD over MUDDY CREEK
Built 1969
TANGENT DR over OWL CREEK
Built 1980
WHITE OAK RD over OWL CREEK
Built 1978
CHURCH DRIVE over MUDDY CREEK
Built 1954
STAHLBUSCH ISL RD over WILLAMETTE R. E.CHANNEL
Built 1996
OAKVILLE RD over MUDDY CREEK
Built 1975
OR 34 (Hwy 210) over Owl Creek
Built 1965
SE KIGER ISLAND DR over WILLAMETTE RIVER ARM
Built 1963
TANGENT DR over CALAPOOIA RIVER
Built 2008
SE CRYSTAL LAKE DR over MILL RACE
Built 1985
Bridge Details
- Structure #
- 12260 000200306
- Year Built
- 1961
- Length
- 7 m (23 ft)
- Max Span
- 6.4 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,450
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $96,000
- Total Project Cost
- $153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.