BAKER CREEK RD over BAKER CREEK

6.0 MI W MCMINNVILLE · County 071, Oregon · Built 1968 · 2 Lanes · 218 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
11751 000
Year Built
1968
Length
11 m (36.1 ft)
Max Span
10.7 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
218
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$115,000
Total Project Cost
$184,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.