PIKE ROAD over TURNER CREEK

0.2 MI W CTY LIM YAMHILL · County 071, Oregon · Built 1959 · 2 Lanes · 785 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
11517 020 00032
Year Built
1959
Reconstructed
2024
Length
12.5 m (41 ft)
Max Span
11.9 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
785
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.