I-5 NB TO I-205 NB over I-5 SB CONN TO I-205 NB

1.5 MI S OF TUALATIN R. · County 067, Oregon · Built 1969 · 2 Lanes · 18,656 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
09743C001C28848
Year Built
1969
Length
71.6 m (234.9 ft)
Max Span
35.1 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
18,656
Material
Steel Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.