OR 140 (HWY 431) over TWENTYMILE CREEK
046 MI E ADEL · County 037, Oregon · Built 1966 · 2 Lanes · 308 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
42.174694, -119.811322
This bridge is in worse condition than 81.1% of bridges in County 037. The average bridge in Oregon is 0 years old; this one is 60 years old.
Bridge Details
- Structure #
- 09538 431 03278
- Year Built
- 1966
- Length
- 31.7 m (104 ft)
- Max Span
- 7.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 308
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $367,000
- Total Project Cost
- $587,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.