I-5 (HWY 001) SB over SUNNY VALLEY RD

12.9 MI N OF G PASS NCL · County 033, Oregon · Built 1966 · 3 Lanes · 10,597 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
09439A001 07139
Year Built
1966
Length
39.3 m (128.9 ft)
Max Span
14.6 m
Width
17.5 m (57.4 ft)
Lanes
3
Daily Traffic
10,597
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$413,000
Total Project Cost
$661,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.