CONNS 6 7 &8 over CONN 2 (HWY 47)

SUNSET INTERCHANGE · County 051, Oregon · Built 1967 · 4 Lanes · 569 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

45.513761, -122.689942

This bridge is in worse condition than 12.5% of bridges in County 051. The average bridge in Oregon is 0 years old; this one is 59 years old.

Nearby Bridges

Bridge Details

Structure #
09254H061C00118
Year Built
1967
Length
12 m (39.4 ft)
Max Span
10.7 m
Width
52.2 m (171.3 ft)
Lanes
4
Daily Traffic
569
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$112,000
Total Project Cost
$179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.