SW 1ST AVE over HWY 61
0.2 MI N OF WATER AVE · County 051, Oregon · Built 1964 · 4 Lanes · 71,649 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.505564, -122.678728
This bridge is in worse condition than 12.5% of bridges in County 051. The average bridge in Oregon is 0 years old; this one is 62 years old.
Nearby Bridges
I-405 (HWY 061) CO over HWY 61 NB TO HWY 1 NB
Built 1973
I-405 (HWY 061) over HWY 47 CONN 1
Built 1967
US 26 (HWY 047) CO over HWY 061 I-405
Built 1967
US 26 (HWY 047) CO over HWY 061 I-405
Built 1967
HWY 91 over HWY 61
Built 1964
US26 (HWY 026AC) over ARTHUR ST VIADUCT
Built 1947
OR 99W (HWY 001W) over ARTHUR STREET
Built 1947
HY 61SB CONN HY1SB over Water Ave
Built 1966
HY 1SB TO HY 61NB over MARQ RAMP TO HWY 61 NB
Built 1965
SW 4TH AVE over HWY 61
Built 1964
Bridge Details
- Structure #
- 09154 061 00071
- Year Built
- 1964
- Length
- 65.6 m (215.2 ft)
- Max Span
- 24.8 m
- Width
- 27.1 m (88.9 ft)
- Lanes
- 4
- Daily Traffic
- 71,649
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,995,000
- Total Project Cost
- $3,192,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.