OR 42 (HWY 035) over Mid. Fk. Coquille River

05.1 MI E MYRTLE POINT · County 011, Oregon · Built 1962 · 2 Lanes · 3,336 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
08876 035 02567
Year Built
1962
Reconstructed
1970
Length
80.8 m (265.1 ft)
Max Span
30.5 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
3,336
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.