US199 (HWY 025) over SAND CREEK
3 MI W OF GRANTS PASS · County 033, Oregon · Built 1960 · 4 Lanes · 15,545 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
42.416069, -123.384161
This bridge is in worse condition than 9.4% of bridges in County 033. The average bridge in Oregon is 0 years old; this one is 66 years old.
Nearby Bridges
Elmer Nelson Way over Sand Creek
Built 2016
HUBBARD LANE over SAND CREEK
Built 1963
COLLEGE DRIVE over IRRIGATION CANAL
Built 1967
SAND CREEK ROAD over SAND CREEK
Built 2019
LEONARD ROAD over SPARROWHAWK CREEK
Built 1998
RINGUETTE STREET over IRRIGATION CANAL
Built 1971
R RV LOOP(HWY 260) over EISMAN CREEK
Built 1966
OR 238 (HWY 272) over US 199 (HWY 025) NB
Built 1959
UPPER RIVER ROAD over VANNOY CREEK
Built 1970
OR 99 (HWY 060) over HWY 025 & 272 NB LEGS
Built 1959
Bridge Details
- Structure #
- 08800 025 00295
- Year Built
- 1960
- Length
- 6.1 m (20 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 15,545
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.