I-105 (HWY 227) over COBURG ROAD
01.9 MI E OR99W JCT · County 039, Oregon · Built 1964 · 4 Lanes · 59,050 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
44.062367, -123.080089
This bridge is in worse condition than 37.4% of bridges in County 039. The average bridge in Oregon is 0 years old; this one is 62 years old.
Nearby Bridges
I-105 (HWY 227) CO over COBURG ROAD
Built 1961
HWY 105 over PEDESTRIAN PASS
Built 1999
CENTENNIAL BLVD. over PEDESTRIAN UNDERPASS
Built 1999
I-105 (HWY 227) over COUNTY CLUB ROAD
Built 1963
CENTENNIAL BLVD. over PATTERSON SLOUGH
Built 1967
COBURG ROAD over WILLAMETTE RIVER
Built 1950
DAY ISLAND ROAD over PATTERSON SLOUGH
Built 1984
FERRY ST over UPRR VIADUCT/4-6-7 AVES
Built 1949
FERRY ST over OR 99W
Built 1960
SAND AVE over DEBRICK SLOUGH
Built 1988
Bridge Details
- Structure #
- 08700A227 00196
- Year Built
- 1964
- Length
- 145.1 m (476 ft)
- Max Span
- 41.5 m
- Width
- 20.6 m (67.6 ft)
- Lanes
- 4
- Daily Traffic
- 59,050
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,348,000
- Total Project Cost
- $5,357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.