I-84 (HWY 002) over CONN VIENTO INT

6.8 MI W HOOD RIVER · County 027, Oregon · Built 1965 · 4 Lanes · 24,223 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
08534 002 05604
Year Built
1965
Length
33.5 m (109.9 ft)
Max Span
13.4 m
Width
23.9 m (78.4 ft)
Lanes
4
Daily Traffic
24,223
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$564,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.