OR 18 (Hwy 39) over Yamhill River Overflow

015 MI W HWY 156 JCT · County 071, Oregon · Built 1963 · 2 Lanes · 24,417 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
08492 039 04576
Year Built
1963
Length
91.4 m (299.9 ft)
Max Span
9.1 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
24,417
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.