OR 22 (Hwy 162) EB over OR 214 (Hwy 163)

6.67 Mi E of Salem · County 047, Oregon · Built 1960 · 2 Lanes · 12,431 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
08471 162 00667
Year Built
1960
Length
43 m (141.1 ft)
Max Span
20.1 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
12,431
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.