I-5 (HWY 001) over HILLCREST DR

.08 MI S OF JCT HWY 25 · County 033, Oregon · Built 1960 · 4 Lanes · 31,567 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
08338 001 05750
Year Built
1960
Reconstructed
1999
Length
51.2 m (168 ft)
Max Span
18.3 m
Width
26.8 m (87.9 ft)
Lanes
4
Daily Traffic
31,567
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$591,000
Total Project Cost
$946,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.