I-5 (HWY 001) over HILLCREST DR
.08 MI S OF JCT HWY 25 · County 033, Oregon · Built 1960 · 4 Lanes · 31,567 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.458539, -123.31225
This bridge is in worse condition than 9.4% of bridges in County 033. The average bridge in Oregon is 0 years old; this one is 66 years old.
Nearby Bridges
I-5 (HWY 001) over BEACON DR
Built 2008
I-5 (HWY 001) over BEACON DR
Built 2008
I-5 (HWY 001) over SCOVILLE RD
Built 1959
NW Savage St. over Gilbert Creek
Built 2016
I-5 (HWY 001) SB over JUMPOFF JOE CREEK
Built 1957
I-5 (HWY 001) NB over JUMPOFF JOE CREEK
Built 1957
HWY 482 SPUR over CORP
Built 1990
I-5 (HWY 001) over HWY 482 SPUR
Built 2008
I-5 (HWY 001) over US 199 OR 99 (HWY 025)
Built 1960
FOOTHILL BLVD. over JONES CREEK
Built 2008
Bridge Details
- Structure #
- 08338 001 05750
- Year Built
- 1960
- Reconstructed
- 1999
- Length
- 51.2 m (168 ft)
- Max Span
- 18.3 m
- Width
- 26.8 m (87.9 ft)
- Lanes
- 4
- Daily Traffic
- 31,567
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $591,000
- Total Project Cost
- $946,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.