Diamond Hill Drive over I-5 (Hwy 1)

055 MI N LANE-LINN LINE · County 043, Oregon · Built 1959 · 2 Lanes · 323 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
08248 001 20906
Year Built
1959
Length
72.8 m (238.8 ft)
Max Span
23.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
323
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.