Tangent Road over I-5 (Hwy 1)
059 MI S OF ALBANY SCL · County 043, Oregon · Built 1958 · 2 Lanes · 488 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.541239, -123.061603
This bridge is in worse condition than 20.6% of bridges in County 043. The average bridge in Oregon is 0 years old; this one is 68 years old.
Nearby Bridges
TANGENT LOOP RD over LAKE CREEK
Built 1971
OR 34 (Hwy 210) over I-5 (Hwy 1)
Built 1994
TANGENT LOOP RD over LAKE CREEK
Built 1961
TANGENT LOOP RD over LAKE CREEK
Built 1981
TANGENT DR over TRIBUTARY OF LAKE CREEK
Built 1968
OR 99E (Hwy 58) over Creek
Built 1954
OR 34 (Hwy 210) over Industrial Park Access
Built 1990
Ridge Drive over I-5 (Hwy 1)
Built 1958
OR 34 (Hwy 210) over Oak Creek
Built 2000
OR 99E (Hwy 58) over Lake Creek
Built 1922
Bridge Details
- Structure #
- 08230 001 22709
- Year Built
- 1958
- Length
- 72.8 m (238.8 ft)
- Max Span
- 23.5 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 488
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $715,000
- Total Project Cost
- $1,144,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.