I-84 (HWY 006) over OLDS FERRY INTERCHANGE

042 MI SE BAKER CO LINE · County 045, Oregon · Built 1973 · 5 Lanes · 12,033 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
08083A006 35617
Year Built
1973
Length
66.8 m (219.2 ft)
Max Span
42.7 m
Width
29.5 m (96.8 ft)
Lanes
5
Daily Traffic
12,033
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.