SJOLI RD over FISHHAWK CREEK

015 MI NW OF BIRKENFELD · County 007, Oregon · Built 1990 · 1 Lanes · 28 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
07C08 151600018
Year Built
1990
Length
17.7 m (58.1 ft)
Max Span
17.4 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
28
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.