US 20 (HWY 33) over Beaver Creek

045 MI E OF HWY 9 JCT · County 041, Oregon · Built 1953 · 2 Lanes · 13,994 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
07533 033 00447
Year Built
1953
Length
22.9 m (75.1 ft)
Max Span
7.6 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
13,994
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$240,000
Total Project Cost
$384,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.