I-5 (Hwy 1) SB over Hwy 1E

00.4 MI N OF JCT 1E · County 047, Oregon · Built 1954 · 2 Lanes · 33,636 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
07524B001 24938
Year Built
1954
Reconstructed
1998
Length
42.7 m (140.1 ft)
Max Span
16.8 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
33,636
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$448,000
Total Project Cost
$717,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.