OR 38 (HWY 045) over I-5 (HWY 001)

06.55 MI E DRAIN · County 019, Oregon · Built 1981 · 2 Lanes · 4,275 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
07470B045 05695
Year Built
1981
Length
68 m (223.1 ft)
Max Span
37.5 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
4,275
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,176,000
Total Project Cost
$1,882,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.