BRIDAL VEIL CONN over I-84 (HWY 002)
10.2 MI E OF SANDY RIVER · County 051, Oregon · Built 1960 · 1 Lanes · 553 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.543611, -122.407617
This bridge is in worse condition than 12.5% of bridges in County 051. The average bridge in Oregon is 0 years old; this one is 66 years old.
Nearby Bridges
I-84 (HWY 002) over UPRR
Built 1965
Hwy 002 Conn over UPRR Conn Rt
Built 1945
Hwy 002 over Oxng Marine Dr
Built 2015
NE 238 (Arata Rd) over Hwy 002
Built 1998
ARATA RD (NE 238) over UPRR
Built 1998
I-84 (Hwy 002) EB over NW Graham Rd
Built 2019
I-84 (HWY 002) WB over NW GRAHAM RD
Built 2019
Hwy 002 WB over Sandy River
Built 2013
Hwy 002 EB over Sandy River
Built 2011
Hwy 002 over NE 223rd (Fairview Ave)
Built 1996
Bridge Details
- Structure #
- 06671A002 02809
- Year Built
- 1960
- Length
- 90 m (295.3 ft)
- Max Span
- 21.3 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 1
- Daily Traffic
- 553
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $824,000
- Total Project Cost
- $1,318,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.