SPRINGWATER ROAD over CLEAR CREEK

005MI SE OF CARVER BRIDGE · County 005, Oregon · Built 1951 · 2 Lanes · 13,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
06512 228 00565
Year Built
1951
Length
39.6 m (129.9 ft)
Max Span
21.3 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
13,600
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$403,000
Total Project Cost
$646,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.