ROAD over N SANTIAM R
.2 MI SW JCT HWY 22-FS 10 · County 043, Oregon · Built 1951 · 2 Lanes · 125 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.708, -122.110061
This bridge is in worse condition than 20.6% of bridges in County 043. The average bridge in Oregon is 0 years old; this one is 75 years old.
Nearby Bridges
OR 22 (HWY 162) over Boulder Creek
Built 1932
CHURCH STREET over NORTH SANTIAM RIVER
Built 1976
OR 22 (HWY 162) over Breitenbush River
Built 1949
ROAD over N SANTIAM R
Built 1959
BLOWOUT ROAD over K CREEK
Built 2002
OR 22 (HWY 162) over Slide Viaduct
Built 1954
ROAD over BLOWOUT CR
Built 1954
OR 22 (HWY 162) over Tumble Creek
Built 1949
ROAD over BREITENBUSH R
Built 1955
ROAD over FRENCH CREEK TRIBUTARY
Built 2012
Bridge Details
- Structure #
- 061804000001668
- Year Built
- 1951
- Length
- 61 m (200.1 ft)
- Max Span
- 24.4 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 125
- Material
- Concrete Continuous
- Design
- Frame (except frame culverts)
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $10,000
- Total Project Cost
- $15,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.