STARKEY HQ ROAD over MEADOW CREEK

5.3 MI FROM HWY 244 · County 061, Oregon · Built 1952 · 1 Lanes · 30 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

45.265583, -118.52175

This bridge is in worse condition than 82.2% of bridges in County 061. The average bridge in Oregon is 0 years old; this one is 74 years old.

Nearby Bridges

Bridge Details

Structure #
061606000001120
Year Built
1952
Length
13.7 m (44.9 ft)
Max Span
12.6 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
30
Material
Concrete
Design
Frame (except frame culverts)
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.