PAVED FDR over NORTH UMPQUA RIVER

EAST END OF LEMOLO LAKE · County 019, Oregon · Built 1967 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.310908, -122.154853

This bridge is in worse condition than 11.2% of bridges in County 019. The average bridge in Oregon is 0 years old; this one is 59 years old.

Nearby Bridges

Bridge Details

Structure #
061503000001541
Year Built
1967
Length
35.1 m (115.2 ft)
Max Span
22.9 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
25
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.