CAMPGROUND LOOP RD over UNION CREEK

U.C. CAMPGROUND · County 029, Oregon · Built 1963 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
061006000001044
Year Built
1963
Length
18 m (59.1 ft)
Max Span
11.6 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.