ROAD over STONE CREEK

S-35 T-5S R-8E WM · County 005, Oregon · Built 1959 · 1 Lanes · 75 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 7 Good

Location

45.089789, -121.802881

This bridge is in worse condition than 33.2% of bridges in County 005. The average bridge in Oregon is 0 years old; this one is 67 years old.

Nearby Bridges

Bridge Details

Structure #
060602000001580
Year Built
1959
Length
8.6 m (28.2 ft)
Max Span
8.2 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
75
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.