FOREST/SUBDIV ACCE over LITTLE DESCHUTES RIVER

4.5 M NORTH OF CRESCENT · County 035, Oregon · Built 1975 · 2 Lanes · 56 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

43.524778, -121.650556

This bridge is in worse condition than 9.3% of bridges in County 035. The average bridge in Oregon is 0 years old; this one is 51 years old.

Nearby Bridges

Bridge Details

Structure #
060102000001009
Year Built
1975
Reconstructed
2000
Length
23.8 m (78.1 ft)
Max Span
9.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
56
Material
Concrete Continuous
Design
Slab
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.