MODOC POINT HWY427 over WILLIAMSON RIVER

5.6 MI S HWY 4 JCT · County 035, Oregon · Built 1982 · 2 Lanes · 596 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
05478A427 00732
Year Built
1982
Length
67.1 m (220.1 ft)
Max Span
17.4 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
596
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.