NO DATA ENTERED over GROUSE CREEK

BEAVER 2 · County 029, Oregon · Built 2004 · 1 Lanes · 50 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
050551000001142
Year Built
2004
Length
21.9 m (71.9 ft)
Max Span
6.1 m
Lanes
1
Daily Traffic
50
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.