US101 (Hwy 9) over Tiger Creek

038 MI N BEAVER · County 057, Oregon · Built 1919 · 2 Lanes · 5,337 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
04651 009 07664
Year Built
1919
Reconstructed
1960
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
5,337
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$90,000
Total Project Cost
$143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.