US101 (HWY 9) over Fogarty Creek

023 MI N DEPOE BAY · County 041, Oregon · Built 1955 · 2 Lanes · 12,270 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
04143A009 12519
Year Built
1955
Length
38.4 m (126 ft)
Max Span
25 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
12,270
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$403,000
Total Project Cost
$646,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.