OR 36 (HWY 229) over Swamp Creek

15.3 E DEADWOOD PO · County 039, Oregon · Built 1960 · 2 Lanes · 669 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
04031A229 02819
Year Built
1960
Length
6.6 m (21.7 ft)
Max Span
6.6 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
669
Material
Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.