OR 36 (HWY 229) over Greenleaf Creek

08.4 E DEADWOOD PO · County 039, Oregon · Built 1951 · 2 Lanes · 416 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
04025A229 02138
Year Built
1951
Length
42.7 m (140.1 ft)
Max Span
16.5 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
416
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.