OR 273 (HWY 273) over CORP OR 273 (Hwy 273)

03.6 MI S OF HWY 021 JCT · County 029, Oregon · Built 1914 · 2 Lanes · 196 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03780 273 00363
Year Built
1914
Length
24.1 m (79.1 ft)
Max Span
8.8 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
196
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$250,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.